PLEASE NOTE:

Due to ongoing inter-agency coordination, the HCRMA will be rescheduling imperative dates affiliated with the 365 Toll Project.

  • Electronic Bid Document release date – Monday, October 2, 2017
  • Mandatory Pre-bid meeting – Tuesday, October 17, 2017 (Time and location TBD)
  • Bid Opening Date – Tuesday, October 31, 2017 @ 3:00 pm

We shall continue to update prerelease data, as it becomes readily available on our website www.hcrma.net. We appreciate your interests and look forward to entertaining questions and concerns.



365 Tollway

100% Schematic

     •  SH 365 from FM 1016 / Conway Ave to McColl Road (SH 365 Segs. 2 & 4)
     •  SH 365 from McColl Rd to US 281 / Military Highway (SH 365 Seg. 1)
     •  US 281 / Military Highway from Spur 600 / Cage Blvd to FM 2557 / Stewart Rd (SH 365 Seg. 3)
     •  BSIF Connector from Spur 29 to US 281 / Military Highway (SH 365 Seg. 3)

Preliminary Information for Industry Partners

October 21, 2016

The HCRMA held an Industry Event on the 365 Tollway Project on October 21, 2016 at the McAllen Convention Center, 700 Convention Center Blvd, McAllen, TX 78501. The event had a successful turnout from potential bidders and local partners. A presentation with Q&A was held that morning with an open house format with viewings of project schematics and animated flythrough. For those interested in future events from the HCRMA please subscribe to our calendar. Inquiries and follow up meetings can be sent to ramon.navarro@hcrma.net.

     •   Sign in sheet
     •   Presentation
     •   Data Link (requires completed electronic file acknowledgement form sent to maria.alaniz@hcrma.net):
           •   95% Roadway Plans (will include ITS/Tolling elements at “issued for bid” set)
           •   Blank Quantity Bid Tabs (for 95% Roadway Plans and 60% ITS/Tolling Plans)
           •   Information on Aggregate Suppliers regarding COTE requirement
               (sources on the TxDOT AQMP and those trying to get on the list)

July 26, 2017

The HCRMA presented updated information regarding the 365 Tollway Project on July 26, 2017 at the AGC Meeting (Heavy Highway) at the Double Tree Hotel at 1800 S 2nd Street in McAllen, Texas. The event had many representatives from the local and nationwide pool of potential bidders, as well as TxDOT PHR District representatives, who had an opportunity to ask questions to which the HCRMA prepared formal written answers after a PowerPoint presentation.

     •   Sign in sheet
     •   Presentation
     •   Data Link (requires completed electronic file acknowledgement form sent to maria.alaniz@hcrma.net):
           •   99% Advance Release Roadway Plans, specs, and blank bid tab (formal bid documents
               to be posted to CivCAST after Letter of Authority is obtained)



Our Purpose

The Hidalgo County Regional Mobility Authority was created to be a proactive partner empowering our community to address our congestion and mobility concerns through local means with local leadership.

Contact Us

118 S. Cage Blvd, 4th Floor
Pharr, Texas 78577 (Map)

Administration
Phone: 956.402.4762
Fax: 956.475.3451

Construction Division
Phone: 956.402.4763

contact@hcrma.net